|
Issue |
Title |
|
Vol 4, No 1 (2011): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Penjadwalan Kegiatan Produksi pada PT. Muliaglass Float Division dengan Metode Forward dan Backward Scheduling |
Abstract
PDF
|
Elika Patricia, Hadi Suryono |
|
Vol 14, No 2 (2021): Journal of Industrial Engineering and Management Systems |
Analisis Penjadwalan Proyek Remote Terminal Unit dengan Penerapan Metode CPM dan PERT di PT. XYZ |
Abstract
PDF
|
Tata Sugiarta |
|
Vol 12, No 2 (2019): Journal of Industrial Engineering and Management Systems |
Analisis Penyebab Kecacatan Produk Weight A Handle Menggunakan Metode Fault Tree Analysis dan Failure Mode and Effect Analysis sebagai Rancangan Perbaikan Produk |
Abstract
PDF
|
Yanuar Alfianto |
|
Vol 10, No 2 (2017): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Perbaikan Kualitas Jasa Layanan Parkir Sepeda Motor Kampus UAJ Semanggi |
Abstract
PDF
|
Trifenaus Prabu Hidayat, Andre Sugioko, Jordan Adrian |
|
Vol 3, No 2 (2010): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Perbandingan Biaya Transportasi Pengiriman Barang antara Metode FIFO dengan Stepping Stone dan Vogel |
Abstract
PDF
|
Budi Gunawan, Sulistiono Wreksodihardjo |
|
Vol 10, No 2 (2017): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Persediaan untuk Menentukan Profit dan Tingkat Pelayanan dengan Metode Simulasi |
Abstract
PDF
|
Rudy Santosa Sudirga |
|
Vol 7, No 2 (2014): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Preferensi Mahasiswa Jakarta Terhadap Kartu Layanan Prabayar GSM |
Abstract
PDF
|
Ronald Sukwadi, Mellisa Mellisa |
|
Vol 16, No 1 (2023): Journal of Industrial Engineering and Management Systems |
ANALISIS PRODUKTIVITAS DENGAN METODE MARVIN E. MUNDEL PADA PT. INDO LAUTAN MAKMUR |
Abstract
PDF
|
Denny Putra Utomo, Jaka Purnama |
|
Vol 13, No 1 (2020): Journal of Industrial Engineering and Management Systems |
Analisis Proses Perawatan Auxiliary Power Units pada Pesawat Udara (Studi Kasus: Keterlambatan Pengembalian APU GTCP 131-9 di PT GAA Tbk) |
Abstract
PDF
|
Nur Fadilah Fatma, Henri Ponda, Bayu Munggara |
|
Vol 13, No 1 (2020): Journal of Industrial Engineering and Management Systems |
Analisis Sistem Antrean sebagai Upaya Mengoptimalkan Layanan Teller di Bank BRI Cabang Cibadak Kabupaten Sukabumi |
Abstract
PDF
|
Agustian Suseno, Jauhari Arifin |
|
Vol 9, No 2 (2016): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Sistem Antrian pada Bengkel Mobil Menggunakan Simulasi |
Abstract
PDF
|
Mirna Lusiani, Ryan Adiputra Irawan |
|
Vol 11, No 2 (2018): Journal of Industrial Engineering and Management Systems |
Analisis Strategi Bersaing Perusahaan Bus Menggunakan Teknik Rantai Markov, Game Theory, dan Short Route Models |
Abstract
PDF
|
Ade Momon Subagyo, Okky Jayadi, Ajeng Chintawati Dewi |
|
Vol 11, No 2 (2018): Journal of Industrial Engineering and Management Systems |
Analisis Tingkat Kecacatan Produk Lever Assy Parking Brake Menggunakan Metode Statistical Quality Control (SQC) |
Abstract
PDF
|
Rianita Puspa Sari, Dewi Puspita |
|
Vol 12, No 1 (2019): Journal of Industrial Engineering and Management Systems |
Analisis Total Productive Maintenance pada Mesin Laminating I dengan Metode Overall Equipment Effectiveness |
Abstract
PDF
|
Zulkani Sinaga, Tri Maryanto |
|
Vol 14, No 2 (2021): Journal of Industrial Engineering and Management Systems |
Analisis Triple Bottom Line Menggunakan Analytical Hierarchy Process: Studi Kasus di Sebuah Perusahaan Circuit Breaker |
Abstract
PDF
|
Shania Paramitha Kusuma, Seong Uook |
|
Vol 4, No 2 (2011): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analisis Waktu Proses Bongkar Muat Barang dengan Menggunakan Teori Antrian |
Abstract
PDF
|
Renatha Hutapea |
|
Vol 6, No 2 (2013): Journal of Industrial Engineering and Management Systems (JIEMS) |
Analysis of Compressive Strength Quality of Aerated Lightweight Concrete Using Taguchi Methods at PT. XYZ |
Abstract
PDF
|
Bianda Mayfiani Tiartanaya, Budi Aribowo |
|
Vol 15, No 2 (2022): Journal of Industrial Engineering and Management Systems |
ANALYTICAL HIERARCHY PROCESS AND TOPSIS APPROACH TO PERFORM SUPPLIER SELECTION IN CONSTRUCTION INDUSTRY |
Abstract
PDF
|
Filscha Nurprihatin, Riki Antonius, Glisina Dwinoor Rembulan, Rafie Djajasoepena, Eko Sulistyo |
|
Vol 2, No 2 (2009): Journal of Industrial Engineering and Management Systems (JIEMS) |
Aplikasi Metode Quality Function Deployment dalam Mengevaluasi Kualitas Pelayanan Dosen Kepada Mahasiswa |
Abstract
PDF
|
Leli Deswindi, Luis Andersen |
|
Vol 15, No 2 (2022): Journal of Industrial Engineering and Management Systems |
CALCULATION OF COST OF PRODUCTION TYPE 36 HOUSE AT PT. DZAKA ROTSA PROPERTY |
Abstract
PDF
|
Friska Putri Rahayu, Muslimin Abdul Rahim |
|
Vol 3, No 1 (2010): Journal of Industrial Engineering and Management Systems (JIEMS) |
Desain Model Data Warehouse dengan Contoh Kasus Perguruan Tinggi |
Abstract
PDF
|
Spits Warnars |
|
Vol 6, No 2 (2013): Journal of Industrial Engineering and Management Systems (JIEMS) |
Design of Knowledge Sharing Strategy with Structural Equation Modelling Method and SWOT Analysis (Case Study: Chemical Industry) |
Abstract
PDF
|
Nur Jariah |
|
Vol 15, No 1 (2022): Journal of Industrial Engineering and Management Systems |
DETERMINANTS OF STRESS RECOGNITION AND JOB SATISFACTION IN HOSPITALS FOR HEALTH PROFESSIONALS IN INDONESIA |
Abstract
PDF
|
Suryo Wibowo, Michael Christian, Sunarno Sunarno, Yustinus Yuniarto |
|
Vol 7, No 2 (2014): Journal of Industrial Engineering and Management Systems (JIEMS) |
Evaluasi dan Usulan Pengembangan Energi Terbarukan untuk Keberlangsungan Energi Nasional |
Abstract
PDF
|
Dino Caesaron, Yona Maimury |
|
Vol 3, No 1 (2010): Journal of Industrial Engineering and Management Systems (JIEMS) |
Evaluasi Keselamatan dan Kesehatan Kerja dengan Metode Job Safety Analysis |
Abstract
PDF
|
Hadi Suryono, Dendy Setiady |
|
26 - 50 of 171 Items |
<< < 1 2 3 4 5 6 7 > >> |