Proposed Office Facilities Layout in Low Voltage Electric Panel Manufacturer

Julliete Angel Luin, Josephine Angel Luin

Abstract


The electrical equipment industry in Indonesia is one of the factors that triggers economic growth. Labor productivity determines the success of project implementation. The non-optimal facility layout is one of the factors that triggers low labor productivity. The non-optimal facility layout affects the flow of information in the company. This study examines the problem of non-optimal office facility layout with TSP, ARC and ARD methods at PT. Duta Wijaya Elektrindo Engineering (PT. DWP). The method stated above can minimize the total distance traveled between office facilities so that work efficiency and workforce productivity may increase. The results of data processing indicate that the recommended office facility layout recommendations that are in accordance with the level of closeness between departments based on PST, ARC and ARD is the first recommendation. With reduced total distance traveled in the first layout of the proposed office facilities, the level of employee productivity and work efficiency will increase. The smallest total distance traveled on the proposed layout of the office facilities is 244.22 meters with a reduction of 36% from the initial conditions.


Keywords


Layout, Facility, Activity Relationship Chart, Activity Relationship Diagram, Priority Scale Table, Distance Traveled

Full Text:

PDF

References


Andiyan, A. et al. (2021) “Construction Project Evaluation Using CPM-Crashing, CPM-PERT and CCPM for Minimize Project Delays,” Journal of Physics: Conference Series, 1933(1), p. 012096. doi: 10.1088/1742-6596/1933/1/012096.

Andry, J. F., Tannady, H. and Nurprihatin, F. (2020) “Eliciting Requirements of Order Fulfilment in a Company,” in IOP Conference Series: Materials Science and Engineering, pp. 1–6. doi: 10.1088/1757-899X/771/1/012023.

Anggit, I. (2019) Menteri Bappenas Sebut Produktivitas Tenaga Kerja RI Rendah, CNBC Indonesia.

Apple, J. M. (1990) Tata Letak Pabrik Dan Pemindahan Bahan. Bandung: ITB Bandung.

Aprilyanti, S. (2019) “Pengaruh Usia dan Masa Kerja terhadap Produktivitas Kerja (Studi Kasus: PT. Oasis Water International Cabang Palembang),” Jurnal Sistem dan Manajemen Industri, 1(2), pp. 68–72.

Arija, H. H. and Perdhana, M. S. (2017) “Pengaruh Desain Kantor Terhadap Produktivitas Karyawan di Puskesmas Batang,” Diponegoro Journal of Management, 6(2).

Asnora, F. H. (2020) “Pengaruh Budaya Organisasi, Beban Kerja dan Disiplin Kerja terhadap Produktivitas Kerja Karyawan pada CV. Akademi Mandiri Medan,” Ecobisma (Jurnal Ekonomi, Bisnis dan Manajemen), 7(2).

Assiddiqi, L. (2016) “Perancangan Tata Letak Laboratorium Analisis Udara di PT. East Jakarta Industrial Park.”

Badan Pusat Statistik (2018) Proyeksi Jumlah Penduduk Indonesia Menurut Kelompok Usia (2015-2045).

Badan Pusat Statistik (2020a) “Pengeluaran untuk Tenaga Kerja Industri Besar dan Sedang Menurut Sub Sektor (Milyar Rupiah), 2000-2017.”

Badan Pusat Statistik (2020b) “Proporsi Tenaga Kerja pada Sektor Industri Manufaktur, 2015 - 2019.”

Business Matters (2020) How to Improve Productivity through Office Design.

Chandra, E. (2019) Menelusuri Pengaruh Lingkungan Kerja Terhadap Performa Karyawan, Finansialku.

Christian, M. et al. (2021) “Business Performance Determinants of Salted Fish Distribution in Kapuk During the COVID-19,” Journal of Distribution Science, 19(6), pp. 29–39. doi: 10.15722/jds.19.6.202106.29.

Darmono, L. A. (2019) Menperin Resmian Pabrik Alat Listrik Tegangan Tinggi Senilai Rp 500 Miliar, Suara Karya.

Daya, M. A., Sitania, F. D. and Profita, A. (2018) “Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode BLOCPLAN (Studi Kasus: UKM Roti Rizki, Bontang),” PERFORMA Media Ilmiah Teknik Industri, 17(2), pp. 140–145. doi: 10.20961/performa.17.2.29664.

Fajrilah, M. E., Aviasti and Nu’man, H. (2017) “Usulan Perbaikan Tata Letak Perkantoran di PT. Brodo Ganesha Indonesia Dengan Menggunakan Software BLOCPLAN (Studi Kasus : PT . Brodo Ganesha Indonesia),” Prosiding Teknik Industri UIB, 3(2), pp. 424–431.

Franklin, N. (2019) Poor Office Design Continues to Hamper Productivity, insight.

Goldberg, D. E. (1989) Genetic Algorithms in Search, Optimization & Machine Learning. Alabama: Addison-Wesley Publishing Company.

Gunawan, F. E. et al. (2020) “Service Quality Analysis of SMEs Tempe in Province of Jakarta, Indonesia,” Technology Reports of Kansai University, 62(7), pp. 3827–3833.

Hamdani, F., Herlina, L. and Kurniawan, B. (2016) “Usulan Layout Perkantoran Baru Menggunakan Metode Activity Relationship Chart dan BLOCPLAN di PT. Krakatau Bandar Samudera,” Jurnal Teknik Industri, 4(2), pp. 4–9.

Hidayat, S. A. and Ariyono, V. (2017) “Usulan Tata Letak Pabrik di PT. Djarum Divisi Workshop (Machine Shop & Fabrikasi) Akibat Pemindahan Lokasi Pabrik,” Prosiding Seminar Nasional Teknologi dan Informatika, 4. doi: 10.2298/PAN0903301G.

Hillier, F. S. and Lieberman, G. J. (2015) Introduction to operations research. 10th ed. New York: McGraw-Hill Education.

Holland, J. H. (1992) Adaptation in Natural and Artificial Systems. Cambridge: Massachusetts Institute of Technology.

HRnews (2020) Workplace Expert Warns of Possible Impact of New Workplace Setups on Employee Productivity.

Inamizu, N. (2015) “Impact of Change in Office Layout on Employees’ Communication Satisfaction,” Annals of Business Administrative Science, 14, pp. 335–350.

International Labor Organization (2016) Upah dan Produktivitas untuk Pembangunan Berkelanjutan.

Irfan, M. et al. (2020) “Determinants of Labor Productivity for Building Projects in Pakistan,” Journal of Construction Engineering, Management & Innovation, 3(2), pp. 85–100.

Karima, B. R., Khamim, M. and Setiono, J. (2020) “Analisa Produktivitas Tenaga Kerja berdasarkan PERMENPUPR dan Perhitungan Lapangan Pekerjaan Beton Bertulang Proyek Apartemen Bess Mansion,” Jurnal Online Skripsi Manajemen Rekayasa Konstruksi Politeknik Negeri Malang, 1(2).

Kasilingam, R. G. (2011) Logistics and Transportation: Design and Planning. New Jersey: Springer Science Business Media.

Kebela, F. T. et al. (2020) “Perbaikan Tata Letak Fasilitas Produksi Incoming Material Menggunakan Systematic Layout Planning di PT. Pan Brothers Tbk. Boyolali,” Performa: Media Ilmiah Teknik Industri, 19(1).

Kementerian Ketenagakerjaan Republik Indonesia (2016) Pengukuran Produktivitas Nasional, Regional dan Sektoral. Jakarta: Direktorat Bina Produktivitas Kementrian Ketenagakerjaan.

Kovács, G. (2019) “Layout Design for Efficiency Improvement and Cost Reduction,” Bulletin of the Polish Academy of Sciences: Technical Sciences, 67(3), pp. 547–555. doi: 10.24425/bpasts.2019.129653.

Kovács, G. and Kot, S. (2017) “Facility Layout Redesign for Efficiency Improvement and Cost Reduction,” Journal of Applied Mathematics and Computational Mechanics, 16(1), pp. 63–74.

Kurangi Ketergantungan Impor Peralatan Listrik, Industri Substitusi Harus Didorong (2017) Dunia Energi.

Lasut, A., Rottie, R. and Kairupan, I. (2019) “Usulan Tata Letak Fasilitas Produksi dengan Metode Systematic Layout Planning,” Jurnal Realtech, 15(1), pp. 40–46. doi: 10.1016/b978-0-12-818364-9.00019-6.

Lekan, O. K., Kayode, O. I. and Morenikeji, A. A. (2017) “Analysis of Plant Layout Design for Operational Efficiency with CRAFT Algorithms,” Acta Universitatis Danubius: Oeconomica, 13(4), pp. 15–27.

Maheswari, H. and Firdauzy, A. D. (2015) “Evaluasi Tata Letak Fasilitas Produksi untuk Meningkatkan Efisiensi Kerja pada PT. Nusa Multilaksana,” Jurnal Ilmiah Manajemen dan Bisnis, 1(3).

Makmun, M. (2018) Indonesia Berpeluang Kembangkan Industri Panel Listrik, Berita Satu.

Mangkunegara, A. . A. P. (2009) Manajemen Sumber Daya Manusia Perusahaan. Bandung: Rosdakarya.

Marlita, E. (2017) “Analisis Faktor yang Memengaruhi Produktivitas Tenaga Kerja dan Dampaknya terhadap Kemiskinan di Indonesia,” Jurnal Fakultas Ekonomi dan Manajemen Institut Pertanian Bogor.

Maulina, R. (2019) 7 Tantangan Industri Manufaktur & Cara Mengatasinya, jurnal.id.

Muslim, D. and Ilmaniati, A. (2018) “Usulan Perbaikan Tata Letak Fasilitas Terhadap Optimalisasi Jarak dan Ongkos Material Handling dengan Pendekatan Systematic Layout Planning (SLP) di PT. Transplant Indonesia,” Jurnal Media Teknik dan Sistem Industri, 2(1), p. 45. doi: 10.35194/jmtsi.v2i1.327.

Muther, R. and Hales, L. (2015) Systematic Layout Planning. Marietta: Management and Industrial Research Publications.

Nurprihatin, F., Elnathan, R., et al. (2019) “A Distribution Strategy Using a Two-step Optimization to Maximize Blood Services Considering Stochastic Travel Times,” in IOP Conference Series: Materials Science and Engineering. IOP Publishing Ltd. doi: 10.1088/1757-899X/650/1/012043.

Nurprihatin, F., Octa, A., et al. (2019) “The Extension Analysis of Natural Gas Network Location-Routing Design Through the Feasibility Study,” Journal of Applied Research on Industrial Engineering, 6(2), pp. 108–124. doi: 10.22105/jarie.2019.174164.1082.

Nurprihatin, F. et al. (2021) “Decision Support System for Truck Scheduling in Logistic Network Through Cross-docking Strategy,” Journal of Physics: Conference Series, 1811(1). doi: 10.1088/1742-6596/1811/1/012009.

Nurprihatin, F., Angely, M. and Tannady, H. (2019) “Total Productive Maintenance Policy to Increase Effectiveness and Maintenance Performance Using Overall Equipment Effectiveness,” Journal of Applied Research on Industrial Engineering, 6(3), pp. 184–199. doi: 10.22105/jarie.2019.199037.1104.

Nurprihatin, F., Jayadi, E. L. and Tannady, H. (2020) “Comparing Heuristic Methods’ Performance for Pure Flow Shop Scheduling Under Certain and Uncertain Demand,” Management and Production Engineering Review, 11(2), pp. 50–61. doi: 10.24425/mper.2020.133728.

Nurprihatin, F., Regina, T. and Rembulan, G. D. (2021) “Optimizing rice distribution routes in Indonesia using a two-step linear programming considering logistics costs,” Journal of Physics: Conference Series, 1811(1). doi: 10.1088/1742-6596/1811/1/012010.

Nurprihatin, F. and Tannady, H. (2018) “An Integrated Transportation Models and Savings Algorithm to Minimize Distribution Costs,” in Proceeding of the 1st Asia Pacific Conference on Research in Industrial and Systems Engineering. Depok: Department of Industrial Engineering Universitas Indonesia, pp. 216–221.

Padmantyo, S., Nursavilla, F. and Ningsih, M. A. (2018) “Pengaturan Ulang Tata Letak Fasilitas Pabrik untuk Meningkatkan Produktivitas (Kasus PT. ASA),” Proceeding of the 8th University Research Colloquium.

Paljug, K. (2020) How to Design a Workspace that Improves Productivity, business.com.

Pramana, D. (2020) “Pengaruh Tata Ruang Kantor terhadap Produktivitas Kerja Pegawai pada Kantor Dinas Kesehatan Daerah Kabupaten Tapanuli Selatan,” Jurnal Administrasi dan Perkantoran Modern, 9(2).

Pransuamitra, P. A. (2019) Produktivitas Pekerja Indonesia di ASEAN Urutan Berapa?, CNBC Indonesia.

Putri, M. V. and Djalil, A. N. H. (2019) “Peningkatan Produktivitas Kerja Bagian Surveyor dengan Perbaikan Tata Letak Fasilitas,” Jurnal Industri Kreatif, 3(2).

Putri, R. E. and Ismanto, W. (2019) “Pengaruh Perancangan Ulang Tata Letak Fasilitas di Area Operasional Kerja Berbasis 5S untuk Pengajuan Modal Usaha,” Dimensi, 8(1), pp. 71–89.

Putri, U. H. (2019) Perbaiki Tata Letak Fasilitas pada Perkantoran Kelapa Sawit PT. Socfin Indonesia Kebun Matapao Sumatra Utara. Medan Area University.

Rosyidi, M. R. (2018) “Analisa Tata Letak Fasilitas Produksi dengan Metode ARC, ARD, dan AAD di PT. XYZ,” Jurnal Teknik WAKTU, 16(1).

Safirtri, N. . et al. (2017) “Analisis Perancangan Tata Letak Fasilitas Produksi menggunakan Metode Activity Relationship Chart,” Jurnal Manajemen2, 9(1), p. 40. doi: 10.29264/jmmn.v9i1.2431.

Siagian, S. P. (2015) Manajemen Sumber Daya Manusia. 23rd ed. Jakarta: Bumi Aksara.

Siahaan, R. C. and Oktiarso, T. (2018) “Perancangan Tata Letak Lantai Produksi Baru dengan Metode Systematic Layout Planning,” Journal of Integrated System, 1(2), pp. 161–179. doi: 10.28932/jis.v1i2.1201.

Siregar, B. P. (2019) Investasi Industri Elektronika Ditargetkan Tembus Rp13 Triliun, Warta Ekonomi.

Sofyan, D. K. and Syarifuddin, S. (2015) “Perancangan Ulang Tata Letak Fasilitas dengan Menggunakan Metode Konvensional Berbasis 5S (Seiri, Seiton, Seiso, Seiketsu dan Shitsuke),” Teknovasi, 2(2), pp. 27–41.

Stephens, M. P. and Matthew P. Stephens (2019) Manufacturing Facilites Design and Material Handling. 6th ed. Indiana: Purdue University Press.

Tahir, S., Syukriah and Baidhawi, S. (2015) “Perbaikan Tata Letak Fasilitas Produksi Menggunakan Algoritma CRAFT,” Malikussaleh Industrial Engineering Journal, 4(2), pp. 36–41.

Tannady, H. et al. (2019) “Process Improvement to Reduce Waste in the Biggest Instant Noodle Manufacturing Company in South East Asia,” Journal of Applied Engineering Science, 17(2). doi: 10.5937/jaes17-18951.

Tannady, H., Andry, J. F. and Nurprihatin, F. (2020) “Determinants Factors Toward the Performance of the Employee in the Crude Palm Oil Industry in West Sumatera, Indonesia.,” in IOP Conference Series: Materials Science and Engineering, pp. 1–5. doi: 10.1088/1757-899X/771/1/012066.

Tannady, H., Erlyana, Y. and Nurprihatin, F. (2019) “Effects of Work Environment and Self-efficacy Toward Motivation of Workers in Creative Sector in Province of Jakarta, Indonesia,” Quality - Access to Success, 20(172), pp. 165–168.

Tannady, H., Nurprihatin, F. and Hartono, H. (2018) “Service quality analysis of two of the largest retail chains with minimart concept in Indonesia,” Business: Theory and Practice, 19, pp. 177–185. doi: 10.3846/BTP.2018.18.

Tompkins, J. A., White, J. A. J. A. and Bozer, Y. . (2010) Facilities Planning. New Jersey: John Wiley & Sons, Inc.

Umar, H. (2018) Riset Sumber Daya Manusia dalam Organisasi. Jakarta: PT. Gramedia Pustaka Utama.

Wignjosoebroto, S. (2003) Ergonomi Studi Gerak dan Waktu. Surabaya: Guna Widya.

Winarno, H. (2015) “Analisis Tata Letak Fasilitas Ruang Teknik Universitas Serang Raya dengan Menggunakan Metode Activity Relationship Chart (ARC),” Seminar Nasional Sains dan Teknologi.




DOI: http://dx.doi.org/10.30813/jiems.v14i1.2410

Refbacks

  • There are currently no refbacks.